|
Setup cost for an inspection in person-hrs (a1) : |
|
|
| | | | |
|
Person hour increase in inspection cost per LOC (a2) :
(i.e. inspection cost is a1+a2*size)
|
|
|
| | | | |
|
Average cost of fixing a defect in later phases :
Average cost of fixing a defect in the present phase
|
|
|
| | | | |
|
Average cost of false alarm :
Average cost of fixing a defect in present phase
|
|
|
| | | | |
|
The parameter k for the control limits :
(limits are set at k*sigma around the mean)
|
|
|
| | | | |
|
Number of KLOC before process goes out of control (d) :
|
|
|